Windermere Homes Designed to Live In
Verano Interiors plans, draws and furnishes renovations across Windermere, Winter Garden and Dr. Phillips. Fixed design fees, a drawing set your contractor can actually build from, and the same designer answering the phone from the first walkthrough to install day.
One designer runs your project from the first measurement to install day
Most of what goes wrong in a renovation is a handoff. Verano is deliberately small: one designer, one fixed fee agreed before any drawing starts, and a written schedule of every fixture, finish and piece of furniture before a trade shows up. We work with eleven contractors around Windermere, and we will tell you honestly when a project does not need a designer at all.
Jane Doe, principal designer
0+
Projects finished since 20150+
Years in Central Florida0+
Average weeks in design0+
Trade and vendor partnersSix ways a project usually starts
Every one of these is quoted as a fixed design fee before work begins. Furniture, materials and trade labor are billed to you by the vendor at our trade price, and you approve the schedule before anything is ordered.
The design fee is fixed and agreed in writing before the first drawing. If the scope changes we requote before we start, not after.
Fee structureWe do not mark up furniture. You are invoiced by the vendor at our trade price and you keep the difference.
PurchasingEvery project leaves with a dimensioned drawing set and a finish schedule, so any contractor in the county can bid it apples to apples.
What you getIf the planner tells you a room does not need a designer, believe it. We would rather lose the fee than take a job that will not repay it.
Who we turn downFour projects, with what they actually cost
Design fee first, then what the homeowner spent with trades and vendors. Figures are rounded and shared with permission.
1. Walkthrough
Ninety minutes in your house with a tape measure and a camera. You leave with a fixed fee in writing, or a straight answer that you do not need us.
2. Drawings
Floor plans, elevations, a finish schedule and one revision round. This is the document your contractor bids from.
3. Ordering
Everything is specified, priced and approved by you before a purchase order goes out. Lead times are published up front.
4. Install
We are on site the day it lands, we stage it, and we run the punch list with the trades directly.
Answer four questions and see what your project costs
These are the same four questions we ask on the phone, and they are the only four that move the number much. The range updates as you answer. It is an estimate from 128 finished projects in this area, not a quote, and we will tell you on the walkthrough if your project sits outside it.
Type sets the base fee, floor area scales it, how much of the job we run multiplies it, and the start date decides whether we can hold the number. Everything else is detail we can sort out in your kitchen.
Nothing is stored unless you send it. If you do send it, the scope arrives with your message so the first phone call starts from this number instead of starting over.
$2,100 to $2,700
Quoted in writing after the walkthrough and it does not move unless the scope does.
$20,000 to $40,000
Furniture, materials and trade labor at cost. We do not mark it up and we do not take a commission on it.
About 3 weeks from walkthrough to final drawings.
Send it over
Your answers ride along with the message, so the first call starts from the number you just saw instead of starting over. We reply within one business day.